Last weekend we spent two days on Heron. It was supposed to be "sailing weekend", but due to the weather and many boat projects that were waiting to be done, it turned out to be "working weekend". Although we did sail a couple of miles.
Soon after we arrived to Klimno on Saturday and boarded Heron it started to rain. We did some smaller things around the boat and although we were working it was really cold and damp. Luckily the rain stopped in early evening and we decided to sail off immediately, but only a couple of miles away to next good anchorage.
We sailed out of the bay to the East, towards Velebit hills.
Although the rain stopped, it was still very cloudy. As always, I was fascinated by the clouds.
After a bit more than an hour we reached the bay of Petrina, where we anchored.
Evening was damp and cold and soon after dinner we snuggled up in our warm sleeping bags and went to sleep. Morning brought a few rays of sun and the bay looked even prettier than the evening before.
The water was crystal clear and all the time Heron was right above the anchor (in the middle of photo, on the right is shadow of me taking the photo).
First bigger project was to disassemble the stairs and reinforce them. We removed the bottom three steps that can be lifted to get to the engine, and the top one, that is fixed. We didn't need to remove the insulation, a while ago it fell down by itself, the weird pattern are the remains of the glue.
Of course we had to invent the way to climb up to the cockpit and then back down into the boat. This was the first solution...
... and this the second, improved, one. It took a bit of gymnastics to use it.
A little after noon we sailed back to Heron's buoy. Well, we did sail for a while, but most of the time the engine was also on.
Once back on the buoy we tackled the second bigger project - to find out why the anchor winch is not working every now and then.
After disassembling the motor and doing some of the work on the toilet we drove home. Now we'll have to do a lot more work before we can go sailing again. We need to reinforce the stairs and assemble everything together (insulation is already glued back on), clean the anchor winch motor and reinforce the toilet with bigger screws or bigger washers.
Easter holiday we spent with our families and next weekend we're back on Heron again.
No comments:
Post a Comment